| Levelling of the site for the pool started on the 19th of September 2005, with the pool being dug on the 23rd of September. The Pool was delivered and put in on the Saturday the 24th of September. Since then the pool fittings have been put in and the area has been landscaped, with a retaining wall and steps down into the pool area being built. The concreting around the pool and the permanent pool fence still need to go in. |